IPB

Welcome Guest ( Log In | Register )

> Some pictures of the drilling rig I worked on
blk96gt
post 03/12/07 6:00pm
Post #1


Colonel
Group Icon

Group: {MOB}
Posts: 1244
Joined: November 1st 2004
From: Nacogdoches, Texas
Member No.: 948
Xfire: blk96gt



Some of you probably knew that I stopped going to school for a year and got a job as a roughneck on an offshore drilling rig. I've had a few people ask me about it, so I figured I would post a few pictures of the rig and a little info on what we did.
This is the rig I worked on. If you're wondering how we got up to the rig we used what's called a personnel basket, which is hooked up to the crane. The crane will raise and lower people from/to the boat and rig. You can see the basket hanging from the crane in this picture with four people on it.
Attached Image
This is a good picture from the crew boat that shows the whole rig and the platform that we were working over.
Attached Image
This is the picture of the drillfloor where I spent pretty much all my time. On the left you can see the break-out tongs, which were used to break the two tool joints loose. The torque on 5" drillpipe(which is what we are using here) is around 6000 pounds. When making a trip(pulling the whole drill pipe string out of the hole), you can throw the tongs well over 150 times in a day. You also pull and set the slips(the thing with three handles behind the drill pipe) every time you make/break a connection. Tripping pipe was my favorite thing to do. You were pretty much none stop for 12 hours.
Attached Image
These are just some various pictures on the rig.
Attached ImageAttached ImageAttached Image
Here is a picture of the derrick from the drillfloor. The derrick hand is the one who goes up to the derrick while tripping pipe and racks back or latches up a stand of pipe(a stand of pipe is around 93 feet, and is made up of three joints, which are around 30-32 feet each).
Attached Image
Various pictures from up in the derrick of the drill floor and the rig, and also a picture of the ladder you have to climb up to get to the derrick.
Attached ImageAttached ImageAttached ImageAttached Image
Here is what's called the monkey board, which is what the man in the derrick stands on when making a connection or racking a stand back. The rope/belt thing is called the belly rope. You put that around your waist so you can lean out and reach the elevators. You can also see the bucket to sit on when the times get slow.
Attached Image
These are the fingers where all the stands of pipe are stored. This is one set, and there's also another set on the other side of me. Around 115 stands of 5" drill pipe can be stored on this set of fingers, and something like 70 or 80 on the other.
Attached Image
One of the nice sunsets we get to see.
Attached Image
I've got more, but don't really feel like posting them now, and ya'll probably don't care to see them anyways, but oh well. Enjoy.

This post has been edited by blk96gt: 03/12/07 7:12pm


--------------------
Idle hands spend time at the genitals, and we all know how much God hates that.
User is offlineProfile CardPM
Go to the top of the page
+Quote Post
 
Reply to this topicStart new topic
Replies
HammaTime
post 03/12/07 6:50pm
Post #2


Major General
Group Icon

Group: {MOB}
Posts: 2008
Joined: November 17th 2005
From: Maine, USA
Member No.: 1428



Wow! Thanks for sharing that with us.

It really brings back some memories for me. I worked as a roughneck after college. My rig was north of Odessa, Texas. Throwing the tongs was the most grueling work I've ever done. It didn't help that we were trying to drill as fast as we could and they were short handed. That meant I'd often work double-shifts which KILLED me!

We constantly were thinking about having to escape in an emergency (the first day I had on the job we had a man go down after a release of Hydrogen Sulfide gas) and yet people were always parking their damn trucks in front of our zip line.

I'm sure safety measures have improved dramatically since those days, but we often wondered how comfortable the off-shore guys felt about their emergency systems.

I'll never forget the feeling of being covered head to toe in that damn acidic drilling mud. That's a memory I prefer to forget! LOL!
User is offlineProfile CardPM
Go to the top of the page
+Quote Post
blk96gt
post 03/13/07 12:57am
Post #3


Colonel
Group Icon

Group: {MOB}
Posts: 1244
Joined: November 1st 2004
From: Nacogdoches, Texas
Member No.: 948
Xfire: blk96gt



QUOTE(HammaTime @ 03/12/07 5:50pm) *

Wow! Thanks for sharing that with us.

It really brings back some memories for me. I worked as a roughneck after college. My rig was north of Odessa, Texas. Throwing the tongs was the most grueling work I've ever done. It didn't help that we were trying to drill as fast as we could and they were short handed. That meant I'd often work double-shifts which KILLED me!

We constantly were thinking about having to escape in an emergency (the first day I had on the job we had a man go down after a release of Hydrogen Sulfide gas) and yet people were always parking their damn trucks in front of our zip line.

I'm sure safety measures have improved dramatically since those days, but we often wondered how comfortable the off-shore guys felt about their emergency systems.

I'll never forget the feeling of being covered head to toe in that damn acidic drilling mud. That's a memory I prefer to forget! LOL!

Safety on our rig was #1. We got things done as fast as we could, but if it was a situation where it was do it fast, or do it safely, we would without a doubt do it safely. The hitch I was on hadn't had a recordable injury in almost two years. I was lucky and got on a rig with lots of great people. I had a real good driller, tool pusher, and OIM.

Things have changed a lot though, even in the past 10 years. Most newer (offshore) rigs have iron roughnecks and top drives. That means roughnecks have it easy when they have an iron roughneck, all they have to do is dope pipe. Heck, many of them even have auto racking systems now, so you don't even need a man in the derrick. The only neat thing we had was a top drive. That made it a hell of a lot easier making connections, reaming, and all that jazz, as the top drive could make a connection a whole stand at a time, which means we didn't have to use the mouse hole or the tongs(once we got enough weight on the string) when we made a connection. We still got to throw the tongs when tripping though, which was my favorite part. Actually, my favorite thing was tripping out the hole in the derrick. The best part would be when the driller would start hauling ass. If I remember right, the fastest we ever went was 115 stands in around 3 hours. I was wore out after that day.

And yes, the mud. I don't think there was a day that I did not have mud on me. Man I miss this shit.


--------------------
Idle hands spend time at the genitals, and we all know how much God hates that.
User is offlineProfile CardPM
Go to the top of the page
+Quote Post

Posts in this topic


Reply to this topicStart new topic
1 User(s) are reading this topic (1 Guests and 0 Anonymous Users)
0 Members:

 



- Lo-Fi Version Time is now: 05/04/26 4:32pm
Skin Designed by Canucks Fan Zone